Next in line         
Rail World lease F-40's 310 and 301 wait to be readied for service out in front of the backshop at Boston Engine Terminal
Date: 6/7/2015 Location: Somerville, MA Views: 487 Collection Of:   David Hutchinson
Locomotives: SLC 310(F40PH)    Author:  David Hutchinson
Next in line
Picture Categories: This picture is part of album:  Lease Power on the MBTA
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4213212