Soon to be taken down, the intermediate block signals days are numbered. The new "Vader signals can be seen in the distance and will soon be in operation. Here BNSF 6198 leads this SLC coal load south past the intermediate siginal 61.9 on the BNSF Hannibal Sub. just north of Foley, Mo. Most of the new signals south of this location have already been activated. The line north has been re-blocked in accordance with the new siding "Burns" in Clarksville, Mo. |
Date:
3/5/2016 |
Location:
Foley, MO |
Views:
196 |
Collection Of:
Matthew Schimmel |
Locomotives: |
Author: Matthew Schimmel
|
|
Picture Categories: Roster,Scenic,Signal,Action |
This picture is part of album: Rail-Fanning 2016 Vol. 3 |